Tortilla wrote:- Regarding inadequate light spaces?
At some locations it didn't look like the required 8" was provided.
- If by "breaking slab" art bearing walls you mean the bearing walls sit directly on the footings
Yes.
-- I believe I did that, unless you are referring to the center footing?
Interior bearing walls count too.
- Rated walls are shown as brown, going from top of slab, past rafters, to bottom of deck.
They should do that at each floor. In the image it looks like it runs continuous from first floor to roof deck.
Lastly, can you tell me where I can find the 3.1 practice vignette?
viewtopic.php?f=10&t=13589
Tortilla wrote:Question: For the 4.0 CDS Vignette, is the largest duct/joist combination tied to the room or the floor. In other words, is the assumption there are no ceiling height changes by room or across the entire floor of the building?
Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES
Users browsing this forum: No registered users and 117 guests