1st Attempt building systems vignette

Mechanical & Electrical Plan Vignette and Multiple Choice

1st Attempt building systems vignette

Postby enearchitecture » Fri Feb 02, 2018 8:13 am

Comments welcome. Thank you.
You do not have the required permissions to view the files attached to this post.
Last edited by enearchitecture on Fri Feb 02, 2018 9:00 am, edited 1 time in total.
enearchitecture
 
Posts: 18
Joined: Sat Mar 26, 2016 6:24 pm

Re: 1st Attempt building systems vignette

Postby Sparky83 » Fri Feb 02, 2018 8:50 am

Nothing attached.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm

Re: 1st Attempt building systems vignette

Postby enearchitecture » Fri Feb 02, 2018 9:00 am

sorry just fixed my attachment.
enearchitecture
 
Posts: 18
Joined: Sat Mar 26, 2016 6:24 pm

Re: 1st Attempt building systems vignette

Postby Sparky83 » Fri Feb 02, 2018 10:09 am

Sorry, very clearly failing.
Incorrect spacing for all 2x4 lights.
Rigid duct crosses joists at illegal location. Fatal.
Poor separation between supply & return in the studio, file room, and conference room. Min 4' is recommended.
Accent lights too far apart and too close to the north and south walls.
Grilles in the architect's office and conference room will fall out.
Grille in the studio overlaps the grid.
Uneven HVAC layout in the studio
Dampers should be centered in the wall thickness.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm

Re: 1st Attempt building systems vignette

Postby enearchitecture » Fri Feb 02, 2018 11:14 am

Dear Sparky83, Thanks for quick eye and comments.

Yes, I do agree with your comments, but after review the NCARB passing solution. There appears to be a different 2x4 lighting spacing between Architect's Studio and File Room. NCARB's passing is solution shows one at 4' and the other at 6'. It looks like NCARB got architects studio wrong. Based on the lighting chart the spaced between 2x4 (in the short direction) should be a total of 6'.

The spacing between lights should be 4' between lights and 2' from the wall?
You do not have the required permissions to view the files attached to this post.
enearchitecture
 
Posts: 18
Joined: Sat Mar 26, 2016 6:24 pm

Re: 1st Attempt building systems vignette

Postby Sparky83 » Fri Feb 02, 2018 12:12 pm

enearchitecture wrote:Dear Sparky83, Thanks for quick eye and comments.

Yes, I do agree with your comments, but after review the NCARB passing solution. There appears to be a different 2x4 lighting spacing between Architect's Studio and File Room. NCARB's passing is solution shows one at 4' and the other at 6'. It looks like NCARB got architects studio wrong. Based on the lighting chart the spaced between 2x4 (in the short direction) should be a total of 6'.

The spacing between lights should be 4' between lights and 2' from the wall?

NCARB passing examples contain errors.
2x4 lights should be 4' apart between short ends and 6' apart between long sides.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm


Return to BS - BUILDING SYSTEMS

Who is online

Users browsing this forum: No registered users and 31 guests

cron