by Sparky83 » Tue Dec 12, 2017 5:33 am
Uneven HVAC layout in the studio. Think symmetry.
Poor separation between supply & return in the supply closet, studio and conference room. Min 4' is recommended.
Too many accent lights. Adjust to 4 or 5 and redo spacing.
Ducts may be placed above lights.
Rigid duct layout does not provide for flexibility in locating diffusers. There are large areas that cannot be reached with a max 10' flex.