Vignette 4.0 - 1st Attempt

Mechanical & Electrical Plan Vignette and Multiple Choice

Vignette 4.0 - 1st Attempt

Postby fare75 » Tue Oct 24, 2017 7:43 pm

171025_BS_1.jpg

2 weeks to go... :oops: :oops: :oops:
You do not have the required permissions to view the files attached to this post.
fare75
 
Posts: 195
Joined: Sun Mar 22, 2015 10:35 am

Re: Vignette 4.0 - 1st Attempt

Postby Sparky83 » Wed Oct 25, 2017 10:15 am

Supply closet is SEVERELY over it, and lights are incorrectly spaced.
Uneven HVAC layout in the studio. Think symmetry.
Waaaaay too many accent lights.
Poor separation between supply & return in the supply closet. Min 4' is recommended.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm

Re: Vignette 4.0 - 1st Attempt

Postby fare75 » Wed Oct 25, 2017 11:42 am

Sparky83 wrote:Supply closet is SEVERELY over it, and lights are incorrectly spaced.
Uneven HVAC layout in the studio. Think symmetry.
Waaaaay too many accent lights.
Poor separation between supply & return in the supply closet. Min 4' is recommended.

thanks for the comment! looks like I need to spend more time working on it! :oops: :oops: :oops:
fare75
 
Posts: 195
Joined: Sun Mar 22, 2015 10:35 am


Return to BS - BUILDING SYSTEMS

Who is online

Users browsing this forum: No registered users and 70 guests

cron