Postby ciel » Sun Nov 16, 2014 5:07 pm

Any comments are greatly appreciated.
Is the 2 feet away from the bearing walls taken from the center or edge of the wall?
Thank you in advance,
You do not have the required permissions to view the files attached to this post.
ciel
 
Posts: 88
Joined: Thu Oct 31, 2013 10:38 pm

Re: NCARB Vignette_First Attempt and Questions

Postby archpenguin7 » Tue Nov 18, 2014 1:56 pm

i would measure from edge of wall to be safe
you seem to have a lot of rigid duct runs. short leg of fire damper should face the direction of flow.
conference room underlit
drafting studio lighting is not centered
supply closet underlit
arch office underlit, accent lights seem very far away from the wall and unevely spaced.
supply diffusers and returns seem very oddly spaced in arch office and drafting studio
archpenguin7
 
Posts: 33
Joined: Sun Jun 01, 2014 9:03 am

Re: NCARB Vignette_First Attempt and Questions

Postby ciel » Sat Nov 22, 2014 11:21 pm

archpenguin7 wrote:i would measure from edge of wall to be safe......Will do!
you seem to have a lot of rigid duct runs. short leg of fire damper should face the direction of flow.....did not know this, good information.
conference room underlit
drafting studio lighting is not centered
supply closet underlit
arch office underlit, accent lights seem very far away from the wall and unevely spaced........not sure why these rooms are underlit as I spaced them based on the lighting diagrams.
supply diffusers and returns seem very oddly spaced in arch office and drafting studio
ciel
 
Posts: 88
Joined: Thu Oct 31, 2013 10:38 pm