Coach,
Attempted the Structural Systems- Custom Alternate. My question is:
1) Program states the Reception roof is higher than both Cafeteria roofs. On the upper plan, there is not way to show the upper beam running north/south for both of these roofs, so I decided to rotate the framing for the Reception Roof keeping beams at 35 ft max. Am I over building with this approach or should i rotate the Reception roof framing?
2) Is the single deck span shown correctly over the Reception roof or do I need to show three separate decking spans?
3) Is this solution passable without any errors?
Thanks!!