Postby hcd0001 » Mon Jun 05, 2017 3:19 pm

I see most of the people on here have the joists going the opposite way over the covered entry. Based on the dorf video, I thought the shorter distance was always better? I know it adds a beam at the front though.
Also, as a general rule, always have a beam on the lower level where an upper wall meets a lower roof, correct?

*didnt really think i needed to show the upper roof plan, you can see the joists and the columns match up top (i promise)

Thanks
You do not have the required permissions to view the files attached to this post.
hcd0001
 
Posts: 26
Joined: Wed Feb 25, 2015 11:44 pm

Re: SS Vignette - first attempt

Postby Coach » Fri Jun 09, 2017 2:50 pm

hcd0001 wrote:I see most of the people on here have the joists going the opposite way over the covered entry. Based on the dorf video, I thought the shorter distance was always better? I know it adds a beam at the front though.

That's why it's not always better.

Also, as a general rule, always have a beam on the lower level where an upper wall meets a lower roof, correct?

Yep.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am


Return to SS - STRUCTURAL SYSTEMS

Who is online

Users browsing this forum: No registered users and 58 guests

cron