NCARB 3.1 Vignette
Used the NCARB 4.0 Program and assumed that the clerestory was on the north wall of the cafeteria.

I placed a column along the 44'4" span between the waiting room and cafeteria since the recommended max column spacing is 40' apart. Is that okay or is the column not really needed?

Greatly appreciate all comments!

Thanks,
Peek.
You do not have the required permissions to view the files attached to this post.
PeekaBoo
 
Posts: 124
Joined: Wed Dec 31, 2014 12:19 pm

Re: NCARB 3.1 Vignette

Postby spike » Fri May 12, 2017 10:28 pm

First Level-South wall-Middle col. Would it be better if it was at the junction where delivery wall and storage wall meets south wall?