Please let me know you find anything out of order. The joist spacing in the upper level Reception area is 5'-0", everywhere else is 3'-6". I have also placed a beam for the clerestory windows on the east and west walls of the Cafeteria, respectively. Since the program didn't specify, I assume the clerestory is on the lower level (the practice NCARB vignette has similar language; however, the configuration of the two levels makes it clear that the clerestory is on the upper level.
The structure must accommodate (2) clerestory windows. One shall be located along the full length of the West wall of the Western Cafeteria. One shall be located along the full length of the East wall of the Eastern Cafeteria.
Please let me know what you think, and what your thoughts on assuming the location of the clerestory window.
Thanks!