IL - Alt 4 & Alt 5 Attempts

Interior Layout & Building Layout Vignettes

IL - Alt 4 & Alt 5 Attempts

Postby sshust15 » Sun May 06, 2018 12:44 pm

Hey guys. Decided to combine these two because I finished both of them pretty quick.

-Alt 4 had tons of leftover space for RBO and I felt like I was missing something.

-Alt 5 started out feeling like Alt 3 :x I think the best thing I learned for a scheme that has the JO not connected to RBO is to get the LCR fully complete including door swing allowances. That way other rooms can be adjusted as needed to make the whole plan work.

Please let me know your thoughts on these! Thanks so much!
You do not have the required permissions to view the files attached to this post.
sshust15
 
Posts: 30
Joined: Sun Feb 15, 2015 11:09 am

Re: IL - Alt 4 & Alt 5 Attempts

Postby sbyrktct » Tue May 08, 2018 9:24 am

According to NCARB's comments online, the 60" turning circle should not overlap the doorswing.
Otherwise, clearances look good for both.

Try to avoid floating furniture in the middle of a room.
User avatar
sbyrktct
 
Posts: 1891
Joined: Thu May 24, 2012 9:35 am
Location: http://arehelp.webs.com/


Return to SD - SCHEMATIC DESIGN

Who is online

Users browsing this forum: No registered users and 35 guests

cron