BL - 2nd Try

Interior Layout & Building Layout Vignettes

BL - 2nd Try

Postby home_alone » Mon Apr 23, 2018 5:20 am

Hi folks please check this out, thank you!!

Just noticed door to LM might be at risk for dead end corridor. The door is 19'-4" to the centerline of the main east/west corridor.

BL 1st fl.JPG


BL 2nd fl.JPG


BL both fl.JPG
You do not have the required permissions to view the files attached to this post.
home_alone
 
Posts: 28
Joined: Sat Feb 21, 2015 6:16 pm

Re: BL - 2nd Try

Postby tiredofthis » Mon Apr 23, 2018 7:39 pm

1. 19'-4" is less than 20'-0", so I'd say you're OK with dead end corridors.

2. I can't really see the image very well, but do AO and DO have exterior windows?

3. Also, are there interior windows in R to permit visual control of entry to CR, GR,
& L?

4. This is just by eyeball, so I could easily be wrong, but some of the spaces seem
off in area. SW, for instance, looks small. If you haven't yet, use the ID tool at
the end to quickly make sure all areas are +/- 10% of the program.

Again, these comments may just be caused by my looking at a very blurry image so
apologies if I'm wrong.

Good luck on the test
tiredofthis
 
Posts: 10
Joined: Wed Aug 12, 2015 8:35 pm

Re: BL - 2nd Try

Postby tiredofthis » Mon Apr 23, 2018 7:44 pm

Actually, I take that back about the sizes. They look about right on second viewing.
I'm probably just tired.
tiredofthis
 
Posts: 10
Joined: Wed Aug 12, 2015 8:35 pm


Return to SD - SCHEMATIC DESIGN

Who is online

Users browsing this forum: No registered users and 40 guests

cron