Last pass before testing tomorrow.
Two questions:
1. Should I worry about the Lobby becoming a dead end corridor? In this solution, I reduced the depth to ensure it was less than 20' from the south wall to the corridor plain.
2.Is 3' clear required from the strike side of the south MP exit door? I have this corridor at 6' clear, but the strike side of the door leaves 2'-8" in this solution. Should this corridor be increased in width to accommodate 3' clear?
Any and all comments welcome!
Thanks.