by Coach » Wed Aug 09, 2017 1:50 pm
Corridor between R and GR is unnecessary.
No control of CR or GR.
Swap TS with MP entry and move TS door to west wall.
Align LR doors.
Stair door locations not the most logical. Doors may swing over BLL.
Move SO door east.