Ramp Vignette- ARE 3.1- Testing on Monday

Ramp, Stair, & Roof Vignettes and Multiple Choice

Ramp Vignette- ARE 3.1- Testing on Monday

Postby mofakham » Thu Feb 22, 2018 9:19 pm

Hi Coach and all,

Please check my ramp vignette below.

Two questions;
I eliminated the railing for the first portion of the ramp since it is only 6" raise.
Is the landing by the exit corridor acceptable?

Thanks!
You do not have the required permissions to view the files attached to this post.
Last edited by mofakham on Thu Feb 22, 2018 10:56 pm, edited 1 time in total.
mofakham
 
Posts: 48
Joined: Wed Feb 04, 2015 8:39 pm

Re: Ramp Vignette- ARE 3.0- Testing on Monday

Postby Coach » Thu Feb 22, 2018 9:55 pm

mofakham wrote:I eliminated the railing for the first portion of the ramp since it is only 6" raise.

you still need guardrails.

Is the landing by the exit corridor acceptable?

No. Stair reduces existing egress width. Maintain width until both ramp and stair are accessible.

6" landing requires clear turning circle. Even though east rail is not required for bottom run, I recommend providing it anyway so that you can use continuous rails. Basically, I would simply ignore the no rail required part of the code.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: Ramp Vignette- ARE 3.0- Testing on Monday

Postby mofakham » Thu Feb 22, 2018 10:43 pm

Got it. Thanks a lot coach! :)