Roof Plan Vignette - 1st Attempt - Please Review!

Ramp, Stair, & Roof Vignettes and Multiple Choice

Roof Plan Vignette - 1st Attempt - Please Review!

Postby bradfordpayne » Sat Sep 09, 2017 8:46 pm

Please review, and a couple of questions:
1. I have an intermediate downspout, on the low roof western wall, is this acceptable?
2. Should the downspouts on the east wall at the upper and lower roofs be beside each other?
3. Where is the most ideal place for HVAC condenser, as far away from the clerestory as possible? Do we need to worry about the distance from the roof ridge? Is there a minimum distance between vents, skylights, and hvac?

Thank you in advance for the feedback.
You do not have the required permissions to view the files attached to this post.
bradfordpayne
 
Posts: 49
Joined: Sun Mar 15, 2015 3:11 pm

Re: Roof Plan Vignette - 1st Attempt - Please Review!

Postby Coach » Sat Sep 09, 2017 9:16 pm

bradfordpayne wrote:1. I have an intermediate downspout, on the low roof western wall, is this acceptable?

Yes, but unnecessary.

2. Should the downspouts on the east wall at the upper and lower roofs be beside each other?

Doesn't matter but gutters must be drawn independently.

3. Where is the most ideal place for HVAC condenser, as far away from the clerestory as possible?

It can't be in front of clerestory.

Do we need to worry about the distance from the roof ridge?

Of course. It's in the program.

Is there a minimum distance between vents, skylights, and hvac?

Not really. No reason to crowd things.

No need to interrupt gutter at chimney.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am


Return to BDCS - BUILDING DESIGN & CONSTRUCTION SYSTEMS

Who is online

Users browsing this forum: No registered users and 33 guests

cron