Sajjad Stair Vignette

Ramp, Stair, & Roof Vignettes and Multiple Choice

Sajjad Stair Vignette

Postby madcap3693 » Sat May 27, 2017 8:24 am

Hello!

Here is an attempt @ the Sajjad Vignette. How does it look? Thanks for Reviewing!

Sajjad Stair 1st Fl 05.27.17 copy.jpg


Sajjad Stair 1st Fl 05.27.17 copy.jpg


Sajjad’s Stair Alt. Program

plans are being developed for a new exit located within an existing stairwell in a two-story Administration Building. The design for the other building exits -- a second stairway and the building’s main entrance -- has been completed.

1. Design the stairway to serve as a means of egress from all three building levels leading into the stairwell and through the exit discharge door to the sidewalk at grade (a public way).
 The stairway must provide a continuous path from Second floor to Ground floor exit that includes a landing at the Intermediate level.

2. The total occupant load and number of exits for each level of the building are as follows:

Building Level Total Occupant Load Number of Exits
Ground Floor Level 5 1
Storage Room 440 2
Second Floor 320 2

3. The stairs will be constructed from precast concrete components with the following dimensions:
 Landings: 9 inches deep between the landing soffit and the surface.
 Stair flights/stringers: 12 inches deep between the stair nosings and the stringer soffit measured along a line perpendicular to the soffit.


CODE
Use the written stair code provided with the NCARB problem.
You do not have the required permissions to view the files attached to this post.
User avatar
madcap3693
 
Posts: 158
Joined: Fri Nov 01, 2013 7:25 pm

Return to BDCS - BUILDING DESIGN & CONSTRUCTION SYSTEMS

Who is online

Users browsing this forum: No registered users and 73 guests

cron