Hello All,
Since the SPD design vignette solution has many errors, I was wondering if you guys can give me some feedback.
• The PP is 69 SF over so about 8069 instead of 8000 SF. But I could try to bring it down to 8000 SF
• I am not sure if the north side of PP should be lined with “C” trees or not, in that case the parking could slightly move North without affecting any trees.
• PP gets the noon day sun since it is 60 apart from the office building.
• I understand that the South walkway is a lot paving but this satisfies the condition of forming a continuous walkway system.
Thank you very much in advance.