SITE DESIGN VIGNETTE REVIEW

Site Grading & Site Design Vignettes and Multiple Choice

SITE DESIGN VIGNETTE REVIEW

Postby Aiolas01 » Mon Apr 30, 2018 7:54 pm

attempt number 2, i tried to challenge myself and not have the walkway cross the drive. This took me 1 hour and 10 mins. Still having trouble adjusting the parking once its all drawn out. Let me know your comments.
You do not have the required permissions to view the files attached to this post.
Aiolas01
 
Posts: 2
Joined: Thu Sep 03, 2015 5:32 pm

Re: SITE DESIGN VIGNETTE REVIEW

Postby Sparky83 » Tue May 01, 2018 4:38 am

The west end of the PP has no winter wind protection.
The new tree NW of the pond and the one at the NW corner of the restaurant are not needed.
There is no required offset between the OT and PP.
Drawing sketch circles on the west side of the pond just wastes your time.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm


Return to SPD - SITE PLANNING & DESIGN

Who is online

Users browsing this forum: No registered users and 38 guests

cron