From my solution below to the ALT-3 site design program...
1. Is it okay to have the service drive butt-up against the service entry to the building? or does the 24' wide end of the service drive have to end at the service entry?
2. "Continuous" walkway system -- Is it okay that my walkway to the office tower is a dead end? Walkability is still provided to both streets from the pedestrian plaza.
Any comments are appreciated!
Thanks