Hey team, can you review the following SPD Vignettes please.
SPD Site Grading
1. Can we put the 1st selected contour tight around the building's perimeter or are we required to have a min offset distance from the building?
SPD Site Design
1. Please ignore the 210' required tower and office building separation I adhered to the general conditions of separating the buildings by a min of 20' after I noticed that requirement but am using this as a practice run.
2. In my next attempt I will put in the building separation of at least 210' but does this mean the full building needs to within this parameter or at least any wall can be within the requirement? I am not sure how they are measuring adjacency.
3. Are parking buffers required and if so is their an easy way to draw them or we have to play around with the "create driveway tool" and use 5' buffers?
Where should we place buffers in the parking lot -- only at the ends of the center isles?
4. Does the building canopy also need to be included within the 5'-0" offset requirement?
5. Since the plaza can act as a walkway can you verify if there are adquate walkways in this attempt, there is a 5' walkway located behind the HC Spaces.
6. I also added an extra 3 parking spaces in this design for practice, (total 36 spaces)
Thank You