Your comments are appreciated, testing tomorrow. Time - Grading: 20 mins / Site design 45 mins.
Questions:
- How much can the PP overlap the building entrance pad?
- How much can the sidewalk / driveway overlap the building pads?
- The OT and pond 125 requirement ... does this have to include the whole footprint of the building?
- The building separation of R and OT, 210 apart ... does this include the entry pad?
Thank you!!