Testing Soon! Site Design Attempt 1 - releaze

Site Grading & Site Design Vignettes and Multiple Choice

Testing Soon! Site Design Attempt 1 - releaze

Postby releaze » Tue Oct 31, 2017 4:42 pm

Attempt 1! Please review and advise!!
You do not have the required permissions to view the files attached to this post.
releaze
 
Posts: 11
Joined: Tue Oct 31, 2017 4:32 pm

Re: Testing Soon! Site Design Attempt 1 - releaze

Postby Sparky83 » Tue Oct 31, 2017 7:10 pm

There are gaps in the winter wind protection for the PP.
Coniferous trees should never overlap paving. See the tree diagram.
Why are there 2 walks to the public walk?
The new tree south of the service drive serves no purpose.
HCP parking should be entirely within 100' of the OT entry.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm

Re: Testing Soon! Site Design Attempt 1 - releaze

Postby releaze » Tue Oct 31, 2017 7:25 pm

Thanks sparky, I see now, tricky wording on connecting to public way, I realize now a better reading is only one connection. I also see now that the deciduous trees wouldn’t block wind very well and my pp could have been routed cleaner to avoid the service view. HPC is fully within 100’, that sketch rectangle was deleted in the flurry.
releaze
 
Posts: 11
Joined: Tue Oct 31, 2017 4:32 pm


Return to SPD - SITE PLANNING & DESIGN

Who is online

Users browsing this forum: No registered users and 36 guests

cron