First pass at the site grading. Test is Friday morning.
Comments appreciated!
Sparky83 wrote:Easily passing.
It's good to see the min slope verified correctly.
NOLAcane wrote:looks like the 107' contour line is too close to the building slab. It still needs to comply with the max slope ( so half of 5'-0 would be 2'-6" offset from the slab.
NOLAcane wrote:looks like the 107' contour line is too close to the building slab. It still needs to comply with the max slope ( so half of 5'-0 would be 2'-6" offset from the slab.