Site Design - Attempt 2 (let me have it sparky)

Site Grading & Site Design Vignettes and Multiple Choice

Site Design - Attempt 2 (let me have it sparky)

Postby Trevor » Fri Jun 09, 2017 7:15 pm

I'm not sure if about the connection of my west walk to PP or to the restaurant entry, nor am I sure about the connection of the service entry to the road.
Thanks for any feedback.
Regards.
site design 2.jpg
You do not have the required permissions to view the files attached to this post.
Trevor
 
Posts: 12
Joined: Mon Nov 04, 2013 9:47 pm

Re: Site Design - Attempt 2 (let me have it sparky)

Postby Sparky83 » Sat Jun 10, 2017 4:09 am

Trevor wrote:I'm not sure if about the connection of my west walk to PP or to the restaurant entry, nor am I sure about the connection of the service entry to the road. What are you not sure about?
Thanks for any feedback.
Regards.

A walk running along the edge of the PP is redundant. The PP can abut parking.
Restaurant does not have to have the entry face the pond. Rotate 90 degrees counter clockwise to reduce the length of the service drive.
Building separation appears inadequate.
Winter wind protection for the PP has gaps.
Reduce the amount of the PP shaded by the OT.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm

Re: Site Design - Attempt 2 (let me have it sparky)

Postby Trevor » Sat Jun 10, 2017 1:51 pm

What I wasn't sure about is if the software will recognize those items as being joined.

I measured the building separation from the point of each triangle. There is a sketch circle that just misses the restaurant, it is 210 ft from the OT triangle.
Trevor
 
Posts: 12
Joined: Mon Nov 04, 2013 9:47 pm

Re: Site Design - Attempt 2 (let me have it sparky)

Postby Sparky83 » Sun Jun 11, 2017 4:14 am

Trevor wrote:What I wasn't sure about is if the software will recognize those items as being joined.

I measured the building separation from the point of each triangle.Why did you do that?There is a sketch circle that just misses the restaurant, it is 210 ft from the OT triangle.That's not what the program asks for.
Sparky83
 
Posts: 7649
Joined: Tue Dec 02, 2014 1:36 pm

Re: Site Design - Attempt 2 (let me have it sparky)

Postby Trevor » Sun Jun 11, 2017 10:09 am

I see, it's asked for 210 ft. between any point of the two buildings.
Just to confirm, this is the current program everyone is using : https://www.ncarb.org/sites/default/fil ... _Guide.pdf
Trevor
 
Posts: 12
Joined: Mon Nov 04, 2013 9:47 pm