by Sparky83 » Sat Apr 15, 2017 3:00 pm
Sorry, very poor solution. Clearly failing.
OT entry not visible from Bentley.
Deciduous trees not in the program.
Winter wind protection for the PP incomplete.
Service drive within 5' of the restaurant.
A walk crossing a drive is not continuous as required and is a safety issue.
HCP parking should be entirely within 100' of the OT entry.
No need for 2 walks to the public walk. "minimize paving" is a program requirement,
No pedestrian connection to the PP. All walks are unnecessarily long.
Forcing service vehicles through the parking area is poor design logic.
New trees south of the restaurant serve no purpose.