First attempt at PPP Site Zoning vignette. Last height restriction threw me for a loop, but any feedback greatly appreciated. Thanks!
Site Improvements limits:
25' from water line
5' from any property line
Building setbacks:
25' from Main St
30' from Rear Yard
10' from Side Yard
Max ht 65' west of property line of Lot A = 45' above benchmark
Max ht 0'-40' east of property line of Lot B = 20' above grade at property line
Max envelope = 30 degree line rising eastward from a point at an elevation 20' above benchmark
(Benchmark = 105')
(Grade at property line = 145')