Construction cost
Posted: Tue Mar 13, 2018 7:46 am
Hi all,
I have read that construction estimate cost in pre-planning is based on unit cost, and in schematic design is area volume. Is that right? Is it not the same?
I have read that construction estimate cost in pre-planning is based on unit cost, and in schematic design is area volume. Is that right? Is it not the same?