Please review testing monday, any feedback helps, 1st attemp

Site Zoning Vignette and Multiple Choice

Please review testing monday, any feedback helps, 1st attemp

Postby KOOTA » Sat Dec 02, 2017 8:10 pm

Please review. Thank you.
How many setback circles should I be drawing inorder to get the curve of the lake, is what i have enough or should I have more?
You do not have the required permissions to view the files attached to this post.
KOOTA
 
Posts: 110
Joined: Sun Jan 24, 2016 8:16 pm

Re: Please review testing monday, any feedback helps, 1st at

Postby KOOTA » Sat Dec 02, 2017 8:15 pm

just noticed i was 45' away from west line : corrected... anything else kootaboy?
You do not have the required permissions to view the files attached to this post.
KOOTA
 
Posts: 110
Joined: Sun Jan 24, 2016 8:16 pm

Re: Please review testing monday, any feedback helps, 1st at

Postby greek22 » Fri Dec 08, 2017 7:36 am

-You are missing your surface improvements in plan (blue).
-Lot B has the wrong east setback. The maximum building limit height between 0' AND 40' of the east property line shall be 20' above grade. You have it drawn as 50' from the property line.
-It's hard to tell if your grade line was drawn correctly because it's pixelated. Be sure to use guide lines for this. Extend your line from the section to the contour line being cut.
greek22
 
Posts: 312
Joined: Sat Nov 22, 2014 3:10 pm


Return to PPP - PROGRAMMING, PLANNING & PRACTICE

Who is online

Users browsing this forum: No registered users and 31 guests

cron