some confused questions.. need your comments

Site Zoning Vignette and Multiple Choice

some confused questions.. need your comments

Postby boss3829 » Sun May 14, 2017 7:51 pm

1. what is the most effective phase to consider FF&E?
1. Pre-design 2.Schematice Design 3.Design Development 4.Construction Documentation
-> I have no idea..

2. what is the most effective phase to determine natural ventilation and daylighting?
1. Pre-design 2.Schematice Design 3.Design Development 4.Construction Documentation
-> I thought it is pre-design, because natural ventilation and daylighting have great effect on basic building system and design, so it will be most effective if they are determined before starting schematic design.

3. which category is for superintendent and general man fee?
1. overhead 2. labor 3.indirect cost 4. reimburse
-> I thought it is overhead, because architectural handbook said that Overhead costs associated with construction are usually referred to as general conditions. These costs include those for field supervisory staff, additional professional services staff, engineering consultants, as well as temporary facilities and utilities, small tools, and a variety of safety and security equipment.

Your comments would be very appreciated..