Ballast Alt vignette,
1. program asked for the maximum building height of any portion of a building on lot A to be 75ft above the average grade level at the building line. How is this calculated? i picked the center point between the two boundaries of the building lines and drew a line down to the grade.
2. the passing solution in Ballast shows the building lot line at 5ft from the easement, this is no where to be found in the program as a rule only 5ft from the property line
any help on this is appreciated, testing wednesday.