NCARB Site Zoning -1st Attempt

Postby gretams » Sat Nov 16, 2013 12:44 pm

PPP_SiteZoning.jpg

Any comments are appreciated.

-For the building profile Elevation in Lot "A", I traced the grade line, in Lot "B" I terminated the building profile line at grade. Which is correct for this exam?

Thanks.
You do not have the required permissions to view the files attached to this post.
gretams
 
Posts: 6
Joined: Sat Mar 16, 2013 2:41 pm

Re: NCARB Site Zoning -1st Attempt

Postby Strategy » Sat Nov 16, 2013 1:48 pm

At a glance what I noticed is the building limit (yellow) on East side of Lot A plan does not align with line for building limit in section, and the allowable surface development (blue) can overlap the easement (should set back 5' from PL).
Strategy
 
Posts: 198
Joined: Tue Oct 22, 2013 7:20 am

Re: NCARB Site Zoning -1st Attempt

Postby chase » Fri Nov 22, 2013 1:38 pm

Don't trace the grade line
chase
 
Posts: 12
Joined: Fri Sep 27, 2013 8:15 pm