PPP_SiteZoning.jpg
Any comments are appreciated.
-For the building profile Elevation in Lot "A", I traced the grade line, in Lot "B" I terminated the building profile line at grade. Which is correct for this exam?
Thanks.
You do not have the required permissions to view the files attached to this post.