by jdunks » Sat Mar 31, 2018 9:28 pm
A few things: needs 2nd floor ceiling (which is going to increase truss height - I don't think you have 9' clear right now), ground line & bottom of slab should be same elevation as top of exterior footing, no stem wall on interior footing, and space above lab ceiling may not be quite right - looks small maybe.