Vignette 3.1 Final Try before Test

Building Section Vignette and Multiple Choice

Vignette 3.1 Final Try before Test

Postby Concord55 » Fri Feb 02, 2018 1:30 pm

I am testing on Monday and would appreciate any feedback on the 3.1 Vignette.

Thanks!
You do not have the required permissions to view the files attached to this post.
Concord55
 
Posts: 40
Joined: Sun Jan 21, 2018 6:35 am

Re: Vignette 3.1 Final Try before Test

Postby jbellettiere » Sun Feb 04, 2018 6:53 pm

Bearing walls should extend down to top of footings at grade.
jbellettiere
 
Posts: 40
Joined: Wed Sep 07, 2016 9:16 pm

Re: Vignette 3.1 Final Try before Test

Postby bladeyoon » Sun Feb 04, 2018 8:24 pm

jbellettiere wrote:Bearing walls should extend down to top of footings at grade.


Looks like this part will be accepted by NCARB.
Check below link for more info.
https://plus.google.com/102581411046827 ... kJa3PvqHVg
bladeyoon
 
Posts: 75
Joined: Sat Apr 02, 2016 11:53 pm

Re: Vignette 3.1 Final Try before Test

Postby anonymous283 » Tue Feb 06, 2018 12:48 pm

Here's mine. Doing the test thursday
You do not have the required permissions to view the files attached to this post.
anonymous283
 
Posts: 149
Joined: Thu Jan 11, 2018 2:02 pm

Re: Vignette 3.1 Final Try before Test

Postby anonymous283 » Tue Feb 06, 2018 12:50 pm

you need 2'8" (or 60" total or 52" without fixures) between joist and ceiling on first floor, 2'8"(or 52" total or 44" without fixures) again on the second floor, and 1'8" (or 48" total or 40" without fixures) above the meeting room.
anonymous283
 
Posts: 149
Joined: Thu Jan 11, 2018 2:02 pm


Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 62 guests

cron