Vignette 3.1 Testing Soon

Building Section Vignette and Multiple Choice

Vignette 3.1 Testing Soon

Postby Concord55 » Sun Jan 28, 2018 12:35 pm

Could someone please comment on the 3.1 Vignette?

I calculated the largest joist/duct combinations as follows:
1st floor: 28" J / 24" D for a combined total of 52" (plus 8" additional for the light fixtures)
2nd floor: 20"J / 24" D for 44" (and additional 8")
Double-height space: 28" J / 12 D for 40" (8" additional)

The floor slab runs continuously between the foundation walls. Is this correct?

Does the finish ceiling line have a break where the fire partition is? My ceiling is a continuous line.

Thanks for comments!
You do not have the required permissions to view the files attached to this post.
Concord55
 
Posts: 40
Joined: Sun Jan 21, 2018 6:35 am

Re: Vignette 3.1 Testing Soon

Postby Coach » Mon Jan 29, 2018 8:02 am

Concord55 wrote:The floor slab runs continuously between the foundation walls. Is this correct?

Break slab at all bearing walls.

Does the finish ceiling line have a break where the fire partition is? My ceiling is a continuous line.

Yes.

Stop rated wall at deck.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: Vignette 3.1 Testing Soon

Postby Concord55 » Mon Jan 29, 2018 1:08 pm

Thank you very much for your feedback. It’s greatly appreciated.

I just read in the Dorf guide that it’s recommended to place the joists a little bit (4”-6”) into the wall. Is there any validity to that or can they just align with the wall?
Concord55
 
Posts: 40
Joined: Sun Jan 21, 2018 6:35 am

Re: Vignette 3.1 Testing Soon

Postby Coach » Mon Jan 29, 2018 3:32 pm

I recommend a snap or two into walls.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am


Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 58 guests

cron