by greenHandle23 » Fri Feb 16, 2018 2:00 pm
Your vertical spacing looks spot-on. So, good there. From my perspective viewing this picture file on-line I cannot see the details specifically related to the non-bearing partition, and the fire barrier wall. But as a note, I learned that you need to make sure you break the drop ceiling on both the fire barrier walls and the non-bearing partition walls. Also don't draw the fire barrier so it goes through the metal and concrete deck.