Postby nicolenalvarez » Sun Dec 17, 2017 4:46 pm

It's last minute, but thought I'd post just in case someone saw before the end of the night. I test in the morning. Appreciate any feedback.

thank you
You do not have the required permissions to view the files attached to this post.
nicolenalvarez
 
Posts: 42
Joined: Sat Feb 01, 2014 4:16 pm

Re: 3.1 - First Attempt TEST TOMORROW

Postby nicolenalvarez » Sun Dec 17, 2017 5:36 pm

I caught a mistake. I had calculated the amount of space needed for the duct/joist of the 1st floor correctly but made an error while drawing it. Glad I'm getting in plenty of practice with this lousy software...
nicolenalvarez
 
Posts: 42
Joined: Sat Feb 01, 2014 4:16 pm

Re: 3.1 - First Attempt TEST TOMORROW

Postby Charndc » Sun Dec 17, 2017 9:44 pm

I would check the duct work shown on the 2nd floor. I am getting that the duct work should be 32 x 16 at the cut line, same as the first floor, and your ducts appear to be different sizes.

Good luck,
Charndc
 