CDS Vignette for Review Please

PostPosted: Tue Jul 25, 2017 5:33 pm
by Yakety_Yak
The only thing I can't seem to get is if the ceiling from the lab to the corridor has to be continuous across? Maybe it doesn't matter like the corridor fire rated wall going up through the 2nd floor? Any thoughts or editorials on this and the Vignette are greatly appreciated.

Yak

Failed CDS - Re: CDS Vignette for Review Please

PostPosted: Mon Aug 14, 2017 9:59 am
by Yakety_Yak
Failed yet again, but was surprised I failed the building vignette. Based on my posting on July 25th, over 20 people viewed my vignette and had not commented so I thought I had it, but apparently I didn't. Anyone have any tips? I wish I knew what I did wrong. I always watch Dorf and practice the vignettes a minimum of 4 times. I think I could have passed this one if it wasn't for the Vignette :(

Yak~

Re: CDS Vignette for Review Please

PostPosted: Wed Aug 16, 2017 12:24 pm
by Coach

Re: CDS Vignette for Review Please

PostPosted: Wed Aug 30, 2017 12:38 pm
by Sfny
I noticed
1-on your first floor that the duct in the corridor is too small
2-the interior wall is not projecting above the finish ceiling a few inches
3-It seems that the foundation wall coming up to meet the top of the slab is preferred, with the slab divided between the interior foundation, I know I passed the vignette doing this

Re: CDS Vignette for Review Please

PostPosted: Tue Sep 05, 2017 1:16 pm
by KOOTA
Sfny
i had that same question about the foundation walls ? does the foundation wall stop at the bottom or top of the slab? for the interior bearing wall would the foundation have a small ( 4" or 6" depending on slab) foundation wall?

Re: CDS Vignette for Review Please

PostPosted: Tue Sep 05, 2017 1:37 pm
by Coach
KOOTA wrote:does the foundation wall stop at the bottom or top of the slab? for the interior bearing wall would the foundation have a small ( 4" or 6" depending on slab) foundation wall?

Either way is fine.