Vignette_Mech Room/Duct Clearance Btwn Diff. Height Spaces

Building Section Vignette and Multiple Choice

Vignette_Mech Room/Duct Clearance Btwn Diff. Height Spaces

Postby sarfrapag » Sun May 28, 2017 12:21 pm

In one of the vignette study review material I used, they pointed out that one needed to provide the clearance space necessary to make sure that ducts could go from one height space into another. In the 4.0 vignette, the mechanical space seems to be located in the lower of the two structural spaces, which would mean that the structure of the laboratory space would need to be much higher than most people have drawn it to accommodate the 30"x20" duct that would need to enter the ceiling plenum of the corridor on the second floor. I'm I over thinking this or is this something that needs to be addressed in the solution?
You do not have the required permissions to view the files attached to this post.
sarfrapag
 
Posts: 7
Joined: Sun Mar 05, 2017 12:12 pm

Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 58 guests

cron