CDS vignette First Attempt

Building Section Vignette and Multiple Choice

CDS vignette First Attempt

Postby MattNDallas » Mon May 22, 2017 4:44 pm

Any comments on how I can improve or what I'm doing wrong would be extremely helpful.

Thanks
You do not have the required permissions to view the files attached to this post.
MattNDallas
 
Posts: 10
Joined: Mon Dec 12, 2016 10:06 pm

Re: CDS vignette First Attempt

Postby snandreasian » Wed May 24, 2017 5:32 pm

you're missing the fire rated wall
snandreasian
 
Posts: 18
Joined: Fri Feb 21, 2014 3:56 pm

Re: CDS vignette First Attempt

Postby sarfrapag » Sun May 28, 2017 1:07 pm

Besides the fire rated walls in the corridor, you need to take into account some of the structural section issues. It's hard to tell from the image you've posted, but I think you did overlap the joists and deck enough. However, you also need to stop the slab on grade so that it doesn't intersect the foundation walls. The bearing walls should rest directly on the foundation walls.
You do not have the required permissions to view the files attached to this post.
sarfrapag
 
Posts: 7
Joined: Sun Mar 05, 2017 12:12 pm