I failed CDs first round because I failed the vignette...which I think was due to not practicing it enough because I ran out of time. Also realized I drew a rated wall where there was a non-rated partition wall. I've been practicing more and have a couple questions:
1. If there is a 1-hr non-bearing wall in the same location on each floor, is it correct to draw them separately on each level, stopping at the bottom of deck or are they supposed to be drawn as one continuous wall (which seems counterintuitive since non-bearing but....)?
2. When finding deepest joist + duct combos on a floor:
Is it the joist + duct combo in one particular area (ie deepest duct + deepest joist in one room)?
OR
Is it joist + duct combo of entire floor being drawn (ie deepest joist ANYWHERE @ 1st flr ceiling + deepest duct ANYWHERE @ 1st flr ceiling?