NCARB 4.0 --testing tomorrow

Building Section Vignette and Multiple Choice

NCARB 4.0 --testing tomorrow

Postby ampdesign » Thu Dec 19, 2013 5:22 pm

First floor allowing for 24" duct 8'-4" ceiling with 8" space for lights
2nd Floor allowing for 20" duct 9' ceiling and 8" space
Lab allowing for 20" duct and 8" space with 15' ceiling
You do not have the required permissions to view the files attached to this post.
User avatar
ampdesign
 
Posts: 97
Joined: Sun Dec 08, 2013 4:58 pm

Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 61 guests

cron