NCARB Vignette First Go

Building Section Vignette and Multiple Choice

NCARB Vignette First Go

Postby mobrien » Thu Dec 19, 2013 3:44 pm

Please review.

For the lab space I had:
15'-0" ceiling
8" light clearance
20" duct clearance
32" joist depth
2' parapet

First Floor:
8'-4" ceiling
8" light clearance
24" duct clearance
24" joist depth

Second Floor:
9'-0" ceiling
8" light clearance
20" duct clearance
24" joist depth
2' parapet
You do not have the required permissions to view the files attached to this post.
mobrien
 
Posts: 9
Joined: Thu Dec 05, 2013 11:56 am

Re: NCARB Vignette First Go

Postby ampdesign » Thu Dec 19, 2013 5:25 pm

mobrien wrote:Please review.

For the lab space I had:
15'-0" ceiling
8" light clearance
20" duct clearance
32" joist depth
2' parapet

First Floor:
8'-4" ceiling
8" light clearance
24" duct clearance
24" joist depth

Second Floor:
9'-0" ceiling
8" light clearance
20" duct clearance
24" joist depth
2' parapet


Looks like what I got too so I agree with dimensions. Always a debate about breaking the slab so who knows. I tend to think that it can be drawn continuously but have opted to go with Coach's affirmation that the slabs should be broken at the interior wall footing. Looks good to me.
User avatar
ampdesign
 
Posts: 97
Joined: Sun Dec 08, 2013 4:58 pm


Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 81 guests

cron