NCARB 3.1 Vignette 2nd go--testing Friday

Building Section Vignette and Multiple Choice

NCARB 3.1 Vignette 2nd go--testing Friday

Postby ampdesign » Wed Dec 18, 2013 6:44 pm

Comments welcome thanks.

Stats:

1st floor--
28” joist with
Largest duct 32X16.
8”clear below duct.
Top of footing at 3’ frost line
Partition wall 6” above 8’4” FC
Parapets 2’-8”

2nd floor—
28” Joist
Largest duct 24X12”
8” clear below duct
Parapets 2’-8”
Meeting room FC @ 26'
other space FC @ 8'4"

Fire rated corridor wall to bottom of decks.
You do not have the required permissions to view the files attached to this post.
User avatar
ampdesign
 
Posts: 97
Joined: Sun Dec 08, 2013 4:58 pm

Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 35 guests

cron