Just a couple small details in case anyone has insight:
-Should the top of foundation extend 4"-6" above grade so the slab can be poured up to it on the exterior walls?
-Should the finished ceiling break at the fire rated interior partition or just overlap the two?
-Dorf mentioned in his video to take the interior non fire rated partitions a couple inches above the finished ceiling. Does anyone think this will result in a negative on your score?