Hello ,

I am getting very confused regarding very basic stuff and getting nervous about it. Can anyone help me clarify the following? Apologies in advance if they seem very basic.

1. When architect estimates his fee as a percentage of construction cost in a programming phase does it include the following ?

- Material testing fees
- soil report fee
- permit fees
- legal fees
- Contractors overhead and profit ( I assume that when architect gives a cost idea to the owner after the planning phase , the contractors overhead or profit is not included there ? Or there is a generic 20% fee that is later adjusted after bidding has been done and the construction cost is reflected with that )

2. Is architect in charge of construction cost estimate at a programming phase ? Is this basic service or additional ?Does he present with a cost breakdown after programming has been done ? Or he just states his percentage ?

3. Does construction schedule part of the programming phase ? I

4. n the programming phase does the architect develop a schedule for construction ? When asked to develop a program which one in following are most important to do ?
- Site visit
- Scope of work
- develop construction schedule
- develop project budget
- requirement of equipment

5. FF&E is it part of project budget or construction budget ?.

Thank you.1
biral
 
Posts: 70
Joined: Mon Apr 20, 2015 9:05 pm

Re: Construction cost and schedule

Postby Coach » Tue Jul 07, 2015 5:24 pm

biral wrote:1. When architect estimates his fee as a percentage of construction cost in a programming phase does it "It", meaning construction cost, not architect's fee.) include the following ?

- Material testing fees Yes.
- soil report fee No.
- permit fees No.
- legal fees No.
- Contractors overhead and profit Yes.

( I assume that when architect gives a cost idea to the owner after the planning phase , the contractors overhead or profit is not included there ?

Of course it's included.

Or there is a generic 20% fee that is later adjusted after bidding has been done and the construction cost is reflected with that )

How o&p is included depends on how the estimate is calculated. The unit/system cost guides I've used typically have it built in.

2. Is architect in charge of construction cost estimate at a programming phase ? Is this basic service or additional ?

See B101.

Does he present with a cost breakdown after programming has been done ? Or he just states his percentage ?

That's beyond the scope of the exam.

3. Does construction schedule part of the programming phase ?
4. In the programming phase does the architect develop a schedule for construction ?

Construction schedule is prepared by the contractor. Architect prepares preliminary schedule. See B101.

When asked to develop a program which one in following are most important to do ?
- Site visit

Initial programs are not necessarily site-specific.

- Scope of work

You need a program to know the scope.

- develop construction schedule
- develop project budget

Time and budget are parts of a final program, but not a starting point.

- requirement of equipment

Most relevant item on the given list.

5. FF&E is it part of project budget or construction budget ?.

Yes.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: Construction cost and schedule

Postby biral » Tue Jul 07, 2015 7:28 pm

Coach you are the best! Thank you so much .
biral
 
Posts: 70
Joined: Mon Apr 20, 2015 9:05 pm

Re: Construction cost and schedule

Postby Kiedys.Zdam. » Wed Aug 12, 2015 8:31 am

"5. FF&E is it part of project budget or construction budget ?.

Yes."


Means both?
Kiedys.Zdam.
 
Posts: 328
Joined: Mon Jun 15, 2015 9:58 am

Re: Construction cost and schedule

Postby architect23 » Mon Mar 28, 2016 11:58 am

Kiedys.Zdam. wrote:"5. FF&E is it part of project budget or construction budget ?.

Yes."


Means both?


Which one is it?
architect23
 

Re: Construction cost and schedule

Postby bcaptan » Sat Oct 08, 2016 4:18 pm

FF&E is part of the project budget, not construction cost.
bcaptan
 
Posts: 1
Joined: Thu Oct 01, 2015 4:39 pm

Re: Construction cost and schedule

Postby hnQ_9999 » Thu Apr 06, 2017 2:00 pm

Wonder if "soft cost" and "hard cost" still being used (in the test).
Those terms are easier to relate and memorized.
hnQ_9999
 
Posts: 1029
Joined: Tue Nov 26, 2013 1:35 am


Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 58 guests

cron