Measured Drawings and As-Designed Record Drawings

Building Section Vignette and Multiple Choice

Measured Drawings and As-Designed Record Drawings

Postby hnQ_9999 » Mon Jun 15, 2015 4:59 pm

Can someone shed some realistic lights on
Measured Drawings and As-Designed Record Drawings ?
Thanks.
You do not have the required permissions to view the files attached to this post.
hnQ_9999
 
Posts: 1029
Joined: Tue Nov 26, 2013 1:35 am

Re: Measured Drawings and As-Designed Record Drawings

Postby Coach » Tue Jun 16, 2015 12:17 pm

hnQ_9999 wrote:Measured Drawings

Documenting an existing building.

As-Designed Record Drawings ?

See AHPP.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: Measured Drawings and As-Designed Record Drawings

Postby jestefan » Tue Jun 16, 2015 5:39 pm

Measured Drawings aka As-Built Drawings are considered an additional service According to AIA- B-101-2007 when prepared by the architect at the end of the construction of the project.
Record Drawings are Drawings prepared by the contractor, they are basically mark-ups of Construction Documents.
jestefan
 
Posts: 18
Joined: Wed Mar 18, 2015 1:21 pm

Re: Measured Drawings and As-Designed Record Drawings

Postby Coach » Wed Jun 17, 2015 12:48 am

jestefan wrote:Measured Drawings aka As-Built Drawings are considered an additional service According to AIA- B-101-2007 when prepared by the architect at the end of the construction of the project.


Nope. Measured drawings are of existing conditions.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: Measured Drawings and As-Designed Record Drawings

Postby nidagm » Thu Jun 18, 2015 4:24 pm

Check out http://www.aia.org/aiaucmp/groups/secur ... 026835.pdf

Measured drawings are the drawings of an existing building after being built.
As-constructed record drawings are the drawings GC merks up on their job site copy with red pen as the changes occur.
As-designed record drawings, according to the link above, means Architect redrawing GC mark-ups...although "As-designed" sounds like "original design before changes".....does someone have AHPP to verify "as-designed record drawings" definition?
nidagm
 
Posts: 142
Joined: Sat Jun 06, 2015 9:44 am

Re: Measured Drawings and As-Designed Record Drawings

Postby Coach » Thu Jun 18, 2015 6:19 pm

User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: Measured Drawings and As-Designed Record Drawings

Postby nidagm » Thu Jun 18, 2015 8:21 pm

Thanks, Coach!
nidagm
 
Posts: 142
Joined: Sat Jun 06, 2015 9:44 am

Re: Measured Drawings and As-Designed Record Drawings

Postby hnQ_9999 » Fri Jun 19, 2015 2:02 pm

Thanks for the link Coach, I didn't even know we can read this online.
So, to clarify, "as-built" and "record" drawings are the past.
Now, accordingly to AIA, only "as-designed record" and "as-constructed record" drawings exist.
I am sure, architects will invent ADRD and ACRD for these.
Lots of terminologies like this should be revised to avoid miss-use, like
that of "essential" and "essential service" buildings in CA.
You do not have the required permissions to view the files attached to this post.
hnQ_9999
 
Posts: 1029
Joined: Tue Nov 26, 2013 1:35 am

Re: Measured Drawings and As-Designed Record Drawings

Postby mick2 » Sun Jul 08, 2018 1:41 pm

Is there an AIA contract that I can use to provide existing measured drawings. The client wants to have me provide a separate measured drawing package before we lock in a proposal for the addition to the house.
Does anyone have a standard contract form for this scope of work.
User avatar
mick2
 
Posts: 1225
Joined: Fri Sep 13, 2013 7:02 pm
Location: Los Angeles


Return to CDS - CONSTRUCTION DOCUMENTS & SERVICES

Who is online

Users browsing this forum: No registered users and 59 guests

cron