NCARB vignette

Building Section Vignette and Multiple Choice

NCARB vignette

Postby ellewhyy » Mon Aug 12, 2013 6:52 pm

So, the foundation wall needs to extend above the slab? My bearing walls come down to the grade line. Does this matter?
You do not have the required permissions to view the files attached to this post.
ellewhyy
 
Posts: 23
Joined: Sun May 05, 2013 6:48 pm

Re: NCARB vignette

Postby Coach » Tue Aug 13, 2013 3:21 am

ellewhyy wrote:So, the foundation wall needs to extend above the slab?

No.

My bearing walls come down to the grade line. Does this matter?

Top of footing should align with top or bottom of slab.

Brak slab at interior bearing wall.
Align joists with plan.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am

Re: NCARB vignette

Postby ellewhyy » Wed Sep 04, 2013 5:51 pm

Second attempt is similar with joists aligned. Still confused about depth of plenum. 1st floor (not at laboratory) is at 24" because that is the greatest depth of ductwork coming out of the mechanical room. 2nd floor is at 20" because that is the greatest depth of duct coming out of second floor mechanical room. Could you please explain how to correctly determine this plenum dimension so as to not overdesign those return air plenums? I've heard/studied conflicting approaches to this.
ellewhyy
 
Posts: 23
Joined: Sun May 05, 2013 6:48 pm

Re: NCARB vignette

Postby Coach » Thu Sep 05, 2013 2:25 pm

You must use the largest joist/duct combination -- Find all joist/duct pairs in the area with the same ceiling height and use the largest.
User avatar
Coach
Site Admin
 
Posts: 13249
Joined: Wed May 23, 2012 2:08 am