by sarfrapag » Sun May 28, 2017 1:07 pm
Besides the fire rated walls in the corridor, you need to take into account some of the structural section issues. It's hard to tell from the image you've posted, but I think you did overlap the joists and deck enough. However, you also need to stop the slab on grade so that it doesn't intersect the foundation walls. The bearing walls should rest directly on the foundation walls.
You do not have the required permissions to view the files attached to this post.